As a trusted partner in the US offshore wind, we hold a proven record of supporting US offshore wind clients from the structural concept design through detailed design, fabrication, installation, inspection, and monitoring. Our 15+ years of experience in the offshore wind industry and US supply chain are crucial to providing implementable and novel solutions to clients throughout the full lifecycle of offshore wind structures.

Our extensive experience with U.S. regulations, CVA interface, procurement, and installation of offshore wind structures along with our relationships with reputable fabricators and installation contractors, provide a key advantage in the development, pre-FEED, detailed design, and construction support stages of offshore windfarms by focusing on constructability, efficiency, and reducing CAPEX and OPEX.

offshore wind timeline

July 9, 1988
Keystone Engineering was founded
2005
First IBGS (Twisted Jacket) installed in the Gulf of Mexico
August 2005
Hurricane Katrina, a Category 5 hurricane, moved through the Gulf of Mexico.
2008
UK Carbon Trust Finalist (SMartWind)
2011
SMartWind MetMast installed
Cape Wind Project
2014
Block Island Windfarm
Fishermen's Energy
VOWTAP
2015
US Wind Met Mast
2016
Block Island Windfarm
Block Island Installation
2019
CVOW WTG PE
2020
Jamaica OSW Study
2021-2023
Sunrise, South Fork, Revolution WTG
South Fork Offshore Substation
2022-2023
Gulf of Mexico Feasibility Studies
COSW

Project Experience